State of the Art Production Facility

The project comprised the modification of an existing testing facility at AES Seal plc’s site in Rotherham.

The resultant facility included Testing Laboratories, Offices, Preparation Rooms, Plant spaces and other ancillary areas. SDA designed a ventilation and heating system which used waste heat from the Factory Unit. This provided the Client with savings, at little or no additional capital cost, and simply required careful location of the heat recovery equipment. Preliminary calculations suggested that this should reduce the running cost of the project by approximately £5,000/annum.